01 / PreliminaryMinnesota

Ad astra per terram

By way of the land


Groundscrapers first — deep buildings and hotels — then hotels in low Earth orbit, rotating habitats, and a ring around the Earth.

Project
Faber Orbital
Sheet
01 · Datum
Place
Minnesota
Status
Preliminary
Concept section. Shaft depth is drawn equal to orbit width.

02 / Purpose

Infrastructure, in order.

One circle, cut by the ground line.

Orbit above. Foundation below. A shaft as deep as the orbit is wide.

Faber Orbital is a builder. The first sites are underground: groundscrapers, cut deep enough to operate as buildings and hotels. Structure, air, water, fire, and a night’s sleep are proved there, where a fault can be walked to.

The sequence then leaves the ground. Hotels inside partner stations in low Earth orbit. Large habitats that rotate for gravity. An orbital ring around the Earth. Each phase inherits the standard of the one below it.

  1. 01Groundscrapers
  2. 02LEO hospitality
  3. 03Orbital habitats
  4. 04Orbital ring

03 / Section

From the shaft, upward.

Four phases on one staff. The sheet reads from the groundscraper up. Elevations are nominal drawing stations — the scale breaks at grade, because bedrock and orbit do not share a ruler.

  1. Groundscrapers

    Shaft 01−240 mNow

    Deep buildings and hotels. Occupied structure in bedrock — the civil works Faber Orbital builds first.

  2. Grade
  3. Scale break. Not to scale above grade.

  4. LEO hospitality

    LEO+400 km

    Hotels inside partner stations in low Earth orbit. Guest operations and crew discipline, before a habitat of our own.

  5. Orbital habitats

    Hab 01Nominal

    Large habitats that turn to keep a floor underfoot. Long-stay structure: air, water, and gravity you can stand in.

  6. Orbital ring

    Ring 01Ring

    A ring around the Earth, founded on everything learned below it. The long work.

04 / Notes

Why the shaft comes first.

  1. 01

    Prove the section where you can stand.

    A shaft and an orbital volume ask the same things of a builder: a shell, air, water, fire, and a way out. Below grade those systems are tested at full size, and a failure can be reached on foot.

  2. 02

    A hotel is an operations manual.

    Keeping people well in a sealed building is the work. A groundscraper hotel teaches the staffing, the maintenance, and the standard a LEO hotel will be judged by.

  3. 03

    Leave something that already stands.

    The first phase is a building, with code, cost, and occupants. Later phases inherit a company that has finished a structure — not a rendering of one.

05 / Transmittal

Register interest.

Faber Orbital is in early formation. Leave an email and this page opens a draft in your mail client. Nothing is stored here, and no form service is loaded.

FO–05

Write directly

Opens a draft to hello@faberorbital.com. Nothing is stored on this page.