01 / PreliminaryMinnesota
Ad astra per terram
By way of the land
Groundscrapers first — deep buildings and hotels — then hotels in low Earth orbit, rotating habitats, and a ring around the Earth.
- Project
- Faber Orbital
- Sheet
- 01 · Datum
- Place
- Minnesota
- Status
- Preliminary
02 / Purpose
Infrastructure, in order.
One circle, cut by the ground line.
Orbit above. Foundation below. A shaft as deep as the orbit is wide.
Faber Orbital is a builder. The first sites are underground: groundscrapers, cut deep enough to operate as buildings and hotels. Structure, air, water, fire, and a night’s sleep are proved there, where a fault can be walked to.
The sequence then leaves the ground. Hotels inside partner stations in low Earth orbit. Large habitats that rotate for gravity. An orbital ring around the Earth. Each phase inherits the standard of the one below it.
03 / Section
From the shaft, upward.
Four phases on one staff. The sheet reads from the groundscraper up. Elevations are nominal drawing stations — the scale breaks at grade, because bedrock and orbit do not share a ruler.
Groundscrapers
Deep buildings and hotels. Occupied structure in bedrock — the civil works Faber Orbital builds first.
- Grade
Scale break. Not to scale above grade.
LEO hospitality
Hotels inside partner stations in low Earth orbit. Guest operations and crew discipline, before a habitat of our own.
Orbital habitats
Large habitats that turn to keep a floor underfoot. Long-stay structure: air, water, and gravity you can stand in.
Orbital ring
A ring around the Earth, founded on everything learned below it. The long work.
04 / Notes
Why the shaft comes first.
01
Prove the section where you can stand.
A shaft and an orbital volume ask the same things of a builder: a shell, air, water, fire, and a way out. Below grade those systems are tested at full size, and a failure can be reached on foot.
02
A hotel is an operations manual.
Keeping people well in a sealed building is the work. A groundscraper hotel teaches the staffing, the maintenance, and the standard a LEO hotel will be judged by.
03
Leave something that already stands.
The first phase is a building, with code, cost, and occupants. Later phases inherit a company that has finished a structure — not a rendering of one.
05 / Transmittal
Register interest.
Faber Orbital is in early formation. Leave an email and this page opens a draft in your mail client. Nothing is stored here, and no form service is loaded.